Home » Case Studies
Case Studies
Case Study I: BALHAM
PROJECT SNAPSHOT:
Location: Balham, London | Block Size: 5 Flats | Savings: £7,039.30 on Insurance.
The Challenge:
Outdated communal areas & non-compliant emergency lighting posed safety and aesthetic issues.
Our Solution:
- Redecoration of communal spaces.
- Installation of energy-efficient LED emergency lighting.
- Resolved 20 Health & Safety concerns.
Results & Highlights:
- Installed energy-efficient LED emergency lights.
- Fully redecorated communal area.
- 20 health & safety recommendations resolved.
- Reduced future maintenance costs.
- £7,039.30 saved on building insurance premiums.
- Ongoing inspections ensuring compliance & upkeep
Client Testimonial
“Great service from the team and very professional. My hallway looks so much brighter and cleaner since the support of Cadmus Property”.
Case Study II: Fulham
PROJECT SNAPSHOT:
Location: Fulham, London | Block Size: Multi-Unit Residential | 15%
Savings on Building Insurance
The Challenge:
The property faced a growing list of unresolved maintenance issues,
inefficient insurance costs, and lacked a proactive maintenance
strategy. The ageing building required continuous attention and
upgrades to avoid costly long-term damage.
Our Solution:
- Compiled a comprehensive list of property issues.
- Resolved outstanding maintenance problems systematically.
- Sourced competitive insurance quotes, switching brokers for savings.
- Oversaw and completed external decorations within 6 weeks.
- Constructed a new fire safety enclosure to improve compliance.
Results & Highlights:
- Issues were resolved promptly and efficiently.
- 15% reduction in building insurance.
- Full external decorations completed in 6 weeks.
- Fire safety enclosure constructed for resident safety.
- Lowered operational expenses through competitive tendering.
- Ongoing focus on cost-effective maintenance.
Client Testimonial
“May I take this opportunity to thank you for all your hard work on our
behalf? An ageing property like ours seems to need constant care
and attention, and you are always so patient and efficient.”
Case Study III: Battersea
PROJECT SNAPSHOT:
Location: Battersea, London | Block Size: Multi-Story Residential |
Communal Leak Resolved & Internal Redecoration Completed
The Challenge:
A persistent communal leak was causing disruption and risked
damage to the property’s structure and aesthetics. The building also
required an internal redecoration and system upgrades to restore
resident confidence and ensure compliance.
Our Solution:
- Identified and resolved the source of the communal leak.
- Completed an internal redecoration project within budget.
- Modernized the communal lighting system.
- Oversaw and completed external decorations within 6 weeks.
- Cleared old tenant mail to improve communal space presentation.
Results & Highlights:
- Communal leak resolved efficiently.
- Intercom system upgraded for enhanced resident security.
- Full internal redecoration project completed on budget.
- Communal lighting modernized to improve energy efficiency.
- Improved communal areas by removing outdated tenant mail.
- Increased resident satisfaction through proactive management.
Client Testimonial
“Thank you for all the work you have done on our behalf. Not only has
it been an internationally challenging year, but also our building has
demanded an extraordinary amount of your attention. We greatly
appreciate what you do for us.”
Case Study IV: Hackney
PROJECT SNAPSHOT:
Location: Hackney, London | Block Size: Multi-Unit Residential | Successful RTM Handover & Building Restoration
The Challenge:
Leaseholders were frustrated with the previous managing agent due to unresolved maintenance issues and poor financial transparency. After taking control via a Right to Manage (RTM) process, they struggled to implement effective maintenance and lacked proper financial systems, including opening a client account.
Our Solution:
- Assisted with the post-RTM handover process and set up client accounting.
- Devised a phased, affordable maintenance plan focusing on critical repairs.
- Successfully resolved outstanding issues, improving building condition.
- Provided financial oversight and regular reporting to restore confidence.
- Oversaw key projects including a roof repair and a gate & fob system upgrade.
Results & Highlights:
- Restored the building’s condition with essential repairs.
- Replaced faulty door entry system for improved access control.
- Successfully completed a major roof project.
- Insurance claim processed and resolved.
- Installed and configured a new gate & fob system.
- Strengthened leaseholder trust through transparent financial reporting.
Client Testimonial
“Cadmus were helpful, responsive and professional throughout. A great Property management company to deal with.”
CASE STUDY V: CHALK FARM
PROJECT SNAPSHOT:
Location: Chalk Farm, London Borough of Camden | Block Size: 5- Story Residential with Lift | First Professional Management After 40 Years.
The Challenge:
The building had been self-managed for over 40 years, leading to overdue communal refurbishment needs and unresolved fire safety hazards. The property lacked professional oversight, resulting in compliance risks and deteriorating communal spaces..
Our Solution:
- Managed the property’s first transition to professional block management.
- Completed a full internal redecoration project within budget.
- Resolved critical fire door hazards to ensure H&S compliance.
- Replaced outdated communal carpets.
- Removed unsightly trunking for a cleaner, more modern finish.
Results & Highlights:
- Successfully completed the redecoration project on budge.
- Resolved key health and safety fire door hazards.
- Installed new communal carpets for an enhanced look.
- Insurance claim processed and resolved.
- Removed trunking to improve the visual appeal.
- Provided tailored service for previously self-managed building.
Client Testimonial
“Unfailingly quick to respond to enquiries; efficient in finding solutions and best quotations; thorough and knowledgeable. Definitely a better option than going with a large organization where you might have to deal with several people or departments. He knows and cares about the buildings he looks after and is very good at understanding individual needs. It is a pleasure working with him..”
CASE STUDY VI: CLAPHAM
PROJECT SNAPSHOT:
Location: Clapham, London | Block Size: Multi-Unit
Residential | Major External Works Completed
The Challenge:
The property required major external works and roof repairs, but leaseholders lacked a clear plan and hesitated to
proceed.
Our Solution:
- Built rapport with residents and secured project approval.
- Completed external decorations and roof works to a high standard.
- Implemented a regular gardening program.
- Replaced outdated communal carpets.
- Managed the smooth transfer of documents, funds, and keys.
Results & Highlights:
- Positive relationship built with leaseholders.
- External decorations completed in 10 weeks.
- Roof works successfully delivered.
- Gardening program established.
- Seamless handover with minimal disruption.
Client Testimonial
“Let me take this opportunity to thank you for all your work and responsiveness throughout the year. It is very
appreciated.”